NASA Begins Engine Installation for Artemis III Moon Mission
NASA
- Technicians have started installing four RS-25 engines into the core stage of the Space Launch System (SLS) rocket at Kennedy Space Center.
- The rocket is scheduled to carry the Artemis III crew into orbit in 2027.
Engine Background
- The four specific engines assigned to this mission are identified by serial numbers E2054, E2057, E2048, and E2052.
- All four engines are flight-proven hardware, having been used in previous space shuttle missions.
- Notable historical context for engine E2048 includes:
- Service on space shuttle Discovery during the STS-95 mission in 1998, which carried John Glenn back to space at age 77.
- Service on space shuttle Atlantis during the STS-129 mission, which included NASA astronaut Randy Bresnik.